Asphalt driveway paving

Diamond Asphalt paves new asphalt driveways for homeowners across Tarrant County. We dig out, build a compacted stone base, and lay hot-mix asphalt made to handle Texas heat and shifting clay soil.

Licensed and insured
Free on-site estimates
Over 15 years paving driveways

WHAT IS INCLUDED

What goes into a driveway that lasts.

Site Walk and Measurement

We check slope, drainage, soil, and access, then give you a clear written quote.

Excavation and Grading

The old surface and soft soil come out. We grade so water runs where it should.

Compacted Stone Base

Crushed stone laid and compacted in layers so your driveway does not sink or crack.

Drainage Built In

Pitch and edges set so water runs off your driveway, not under it.

Hot-Mix Asphalt

Fresh hot-mix laid at the right thickness and rolled tight for a smooth, dense finish.

Clean Edges and Tie-Ins

Neat edges and smooth transitions to your garage, walkways, and the street.

WHY DIAMOND ASPHALT

A new driveway is only as good as what is under it.

Anybody can roll out fresh blacktop. The difference shows up three summers later. We are a small family outfit, our name is on the truck, and we pave every driveway like it is going in at our own house.

Real base prep, never a pave-over

We dig out and build a compacted stone base. Laying new asphalt over a failing surface just hides the problem for a season or two.

Mixes picked for Texas heat

Fort Worth summers cook asphalt and our clay soil moves. We set the mix and thickness to handle both.

Honest quotes, no add-ons

The number on the estimate is the number on the invoice. No surprise line items after the machine is running.

We show up when we say we will

If we give you a day, we are in your driveway that morning. If something changes, you hear it from us first.

HOW IT WORKS

How we pave your new driveway.

01

Step 1: Free on-site estimate

We walk the property, check drainage and soil, measure, and give you a clear written price.

02

Step 2: Schedule the work

Pick a window that works for you. We confirm the day, what to move, and how to get in and out.

03

Step 3: Excavate, base, and pave

We dig out, grade, compact the stone base, then lay and roll hot-mix asphalt in one clean push.

04

Step 4: Walkthrough and care tips

We walk the finished driveway with you, go over cure time, and leave the site cleaner than we found it.

DRIVEWAY PAVING COST

What affects the price of a new driveway.

Every driveway is different, so we price each one after we see it in person. Here is what moves the number up or down, so the quote makes sense when you get it.

01

Size and shape

Square footage drives most of the cost. Long runs, curves, and turnaround pads add material and time.

02

What is there now

Tearing out old asphalt, concrete, or gravel adds removal and hauling. A bare lot costs less to start.

03

Base and soil work

Soft spots or poor drainage mean more digging and more stone. We find that at the estimate, not halfway through the job.

04

Thickness and access

Heavier vehicles call for a thicker mat. Tight access or a steep slope can change the equipment we bring.

SERVICE AREA

Driveway paving across Tarrant County.

We pave new asphalt driveways in Fort Worth and the surrounding communities. Not sure if you are in range? Ask when you request an estimate.

Fort Worth
Arlington
Keller
Southlake
North Richland Hills
Benbrook
Weatherford
Aledo

FAQ

Asphalt driveway paving questions, answered.

Straight answers to what Fort Worth homeowners ask us most before they pave. Do not see yours? Ask when you call.

It depends on the size of the driveway, what has to come out first, and how much base work the ground needs. We give you a free written estimate after we see it in person, and the number on the estimate is the number on the invoice.

A driveway built on a properly compacted base, with good drainage and regular sealcoating, typically lasts 15 to 20 years or more in North Texas. Skipping base prep is the most common reason driveways fail early.

Most residential driveways are dug out, based, and paved in one to two days. Larger driveways or heavy base repair can take longer. We confirm the schedule with you before we start.

Give it at least three days before you drive or park on it, and longer in summer heat. For the first few weeks, avoid sharp turns in place, kickstands, jacks, and heavy trucks while the asphalt cures.

Asphalt costs less up front, flexes better as clay soil moves, and is easier to repair. Concrete can last longer but costs more and tends to crack when the ground shifts. For most Fort Worth homeowners, asphalt is the better value.

Sometimes. An overlay can work when the base underneath is solid. If the old surface is cracked through or sinking, paving over it just hides the problem, and a full driveway replacement is the right call. We will tell you which one you need at the estimate.

Yes, just not right away. Let the new asphalt cure for 6 to 12 months, then sealcoat every 2 to 3 years to protect it from sun, water, and oil.

FREE DRIVEWAY ESTIMATE

Get a price on your new asphalt driveway

Phone is quickest. Tell us roughly how big the driveway is and what is there now, and we will get the details straight at the site visit.

Prefer to talk now? (817) 757-6882